Example projects

Up and running.

Maxairea projects delivered with Dutch industry partners. Each installation is instrumented and reported alongside its partners.

Systemair air-handling unit with insulated ductwork at the TEMA Fine Food office
001 / CUIJK· Live Deployment

TEMA Fine Food Office

Cuijk, the Netherlands

Office building

Challenge: ventilation relied largely on windows, with inconsistent indoor air quality and high energy demand (label G, 643 kWh/m²·yr). Solution: room sensors, mechanical ventilation, heat recovery, Maxairea CO₂ filtration and radiator control connected through one intelligent automation layer, with smart control developed with MESH Building Management Solutions. Result: measured data show building-wide P95 CO₂ fell from 942 to 671 ppm (A/B commissioning comparison) and time above 800 ppm from 13.24% to 0.02%, while the official energy label improved from G to C and energy use fell to 224.86 kWh/m²·yr.

Partners

MESH Building Management Solutions · Systemair · Van Haren · ABIP

942 → 671 ppm
Building-wide P95 CO₂
13.24% → 0.02%
Time above 800 ppm
G → C
Energy label
643 → 224.86 kWh/m²·yr
Energy use
120.98 → 42.44 kg/m²·yr
CO₂ emissions

Energy labels from the Dutch RVO energy label register (registration nos. 270832749 and 481786107).

SPIE Office
002 / ELSLOO· Optimizing Phase

SPIE Office

Elsloo, the Netherlands

Office building

The Maxairea Clever Air Care System was added to an existing air-handling unit to improve indoor air quality and reduce energy consumption. Initial results indicate a strong positive impact on IAQ, HVAC energy use, and total cost of ownership. Full results to be announced with the SPIE Netherlands team.

Partners

SPIE Netherlands · Rob air groep

Class A
Indoor Air Quality
TBA
Energy Label
TBA
Total Energy Saving
Maxairea integrated into the rooftop air-handling unit at The Green Village Office Lab
003 / DELFT· Demonstration

The Green Village

Delft, the Netherlands

Demonstration project

The Maxairea Clever Air Care System is integrated into the Office Lab’s air-handling unit at The Green Village, TU Delft Campus. By removing CO₂ from incoming outdoor air, the system aims to reduce the ventilation air that needs to be heated or cooled. This demonstration investigates whether Class A indoor air quality can be maintained with less ventilation air. Monitoring covers CO₂ and other air-quality parameters, alongside an evaluation of energy savings. Project-specific performance results have not been published on The Green Village’s project page.

Partners

InnovationQuarter · The Green Village · Orange Climate · Verkerk · Van Dorp Installaties · Warmtebouw · Priva · TNO

Office Lab, TU Delft Campus
Location
Class A with less ventilation air
Research objective
CO₂ and other air-quality parameters
Monitoring
Bisonspoor Police Station
004 / MAASSEN· Demonstration

Bisonspoor Police Station

Maarssen, the Netherlands

Public building

Nelissen Engineering has incorporated Maxairea’s CO₂ capture technology into the Bisonspoor Police Station design. By treating CO₂ directly, the concept enables approximately 33% lower design airflow, smaller ducts and air-handling capacity, and an estimated 20 kW reduction in both heating and cooling capacity. The project shows Maxairea’s broader value: improving indoor air quality while reducing system size, energy demand and overall building-services costs from the design stage onward.

Partners

Nelissen Engineering

~33%
Design airflow reduction
~20 kW
Heating + cooling capacity reduction